Sunday, July 21, 2013

Multiple Lane Transition with a Green Bike Box

Boston has done a bit with green paint that I thought were notable. Here's a series of photos of an application that you don't often see in the American context. I didn't have a lot of time to study the intersections. 
Here's a photo of a bike box across multiple lanes
the bike lane lead is provided to go from the right hand side to... 
the left hand side, you can see there's also a transition that can occur from the lane
the transition to the left hand side occurs for under the bridge so that you can continue on through the system avoiding a conflict.
     
Posted by Picasa

Traffic Signal Systems Committee Meeting in Portland

At the Summer meeting of the Transportation Research Board Committee on Traffic Signal Systems, we started off the three day meeting on a bike ride of inner Portland, giving the transportation engineers the opportunity to experience the streets on a bicycle. The 20 or so people that joined the trip got to see some of the good, bad, and brand new of the City. The visit included a trip on our City's downtown grid (slow speed progression - good), connections to the Waterfront across SW Naito Parkway (signals not really built for bicycle traffic - bad), the Eastbank Esplanade (relatively new), the Hawthorne Bridge counter (new), and the South Waterfront signals on SW Moody (new and improved).

The sit down meetings on Sunday occurred after lunch with multiple tracks of topic including (Simulation & Asset Management), (Multimodal & Technology - think driverless cars), and Signal Timing. The final session is a Research summary that comes up with Problem Statements that will be forwarded to the AASHTO Standing Committee on Research (SCOR) which results in some ideas that end up getting funded that can improve our practice in traffic signal systems.

These sorts of visits to bicycle infrastructure exposes engineers to a new mode that aren't always considered in traditional traffic engineering. There have been some cases where engineers have gotten an opportunity to travel to Europe to see the design used for multimodal solutions that have lead to 30% bicycle mode split.

That's a huge difference than Portland and it is largely because of the gaps that exist based on the various designs that have been used over the years and the lack of emphasis on this mode in the U.S.


More thoughts as the meeting continues throughout the next two days.

Saturday, July 20, 2013

Detecting Bicycles at Traffic Signals Sign

The City of Portland has been working with Portland State University students to determine whether the detection of bicycles at traffic signals can be best done with inductive loop detection or some other type. We have studied a variety of different detection types including video and microwave and thermal imaging and there are good applications for these different types depending on the infrastructure at your particular location.

The standard detection remains inductive loops and with that sort of equipment, it is important to get people on bikes in the right spot so the traffic signal infrastructure can work as designed.   My experience in Boston, MA showed a new way of marking and signing where a  person should locate themselves and their bike to get a green indication. I couldn't really determine what the sign meant. It's not intuitive to me and I wasn't sure where I was supposed to place my bicycle.   I am hopeful someone will be able to tell me via the blog comments, without seeing the loop cuts in the pavement (see the last picture), I didn't know what the wording of the sign meant for me to do.    

I would compare this sign to the following video on being detected using the standard sign and detector marking.
Posted by Picasa

Detection of Bicycles at Traffic Signals in Boston

A few more varieties of markings and signage for detecting bicycles at traffic signals
Left turn lane detection marking (adjacent to the through lane marking)
Through movement detection marking
To request Green, wait on bicycle stencil
     
Posted by Picasa

Thursday, July 11, 2013

Bike Rental "Share" in Portland Maine

I was at the Portland, ME Amtrak railroad station and had a chance to try out the bike rental/bikeshare system called Zagster. Zagster had ten bikes lined up at a rack adjacent to the train station, less than 50 feet from the door. The system required a login and password (on the web) and I had set that up a couple of weeks before. I found the interface

The bikes were Breezer bikes with full fenders a rear rack and a front basket which made carrying my luggage from the station easier than I anticipated.  The one downside of reserving the bike online through the Zagster website is that they didn't indicate what size the bike was, so I reserved #209 and did not get one that was my size. It worked out, but it's something I shared with customer service as an idea to improve the web interface.

The docking station is not as elaborate as other bike share stations I have seen in Montreal, Washington D.C., etc. but was simple and did the trick. Rather than get a code from a kiosk adjacent to the bikes like these other units, it was delivered via text message on my phone. The text message allowed me to open the lock box that was simply bolted to the rear rack. It reminded me of the lock boxes that realtors use to control access to a spare key for a house they are showing, a simple solution to a problem with controlling access to the bikes.  The key to the lock was inside the box and attached to a cable that could be pulled out to operate the lock.

I did have trouble with the lock box in that I failed to close the box and that seemed to cause problems when I tried to reclose the bike. It also could have been user error.

The biked worked well for my trips and included a chain guard, so that is great for those that were just jumping on from the train station. One complaint was that the lights on the bike were really limited to  the 1-LED Frog bike lights (originally by Knog). At least there were lights on the bikes, unfortunately they weren't worth much for actually seeing the potholes of Portland, ME.

The pricing was more traditional than the newest bike shares that are by the hour with a single day membership. At $20 a day, it was about the same as the local bike shop ($25) with the upside of the Zagster bike being that it was right at the train station and the bike was set up with all the necessary equipment (fenders, chain guard), that I could just get on and ride without any additional gear (I did wear a helmet with another tail light).

I would definitely use it again for day trips, of course the limitation of the system is that is just one dock in the City, but I could see a second dock in downtown Portland being useful for some of the bus transit that was part of the community.   
Posted by Picasa

Wednesday, July 3, 2013

Signal Timing Progression Speeds in Downtown

A question on the Institute of Transportation Engineers listserv came from Boise, Idaho related to downtown signal timing progression speeds. Here's my response.
 
In Portland, OR our downtown progression speeds are 13 to 16 mph depending on time of day. We use a quarter cycle offset system. This works well because the block spacing is limited. I wrote a short blog post on this a few years ago that might be worth a read if you have the time. http://koonceportland.blogspot.com/2010/10/portland-tribune-article-on.html

In Baltimore, we did some work north of the downtown streets in 2007 where we chose a 25 mph speed in the off peak in an attempt to calm the traffic in the neighborhood where there were lower off peak volumes.

Chapter 2 of the Signal Timing Manual describes this rather succinctly. I have excerpted it for your benefit, but we tried to write a summary of how policies like this should be considered carefully with the context of the urban form. Here's some of the text edited for brevity:

Broader land use transportation policies should define the objectives for signal timing plans. User expectations for a street network are often the guiding principles for an agency’s policies. In a downtown setting, the City should want to make sure pedestrian safety needs are prioritized, which is best done by keeping travel speeds consistent. This is best done by having adequate pedestrian crossing times and the lowest cycle lengths possible given the width of streets.

I would not use a 85th percentile speed. I would strongly urge you to use a speed that is reasonable to deliver the safest system possible for pedestrians. Using 20 to 25 mph would result in speeds that result in a sustainable system. A slower speed such that we have used in Portland is also good for people on bicycles. Transit efficiencies are also gained if there are numerous blocks where buses are stopping every other intersection.


There was another answer from a retired engineer from Houston. This was very interesting so I am copying it here.

In Houston in the 1950's a fixed time signal system with variable frequency operation was installed. The CBD is a grid of streets (12 X 15 blocks) with 330 feet c.-c. of the streets. The off-peak signal operation was based upon 40, 60, and 80 second timing which resulted in 18, 20, and 22 mph speeds based on 1/4 cycle offsets. The traffic on streets both east/west and north/south traveled at these speeds. The signal cycles were determined by traffic counts entering and leaving the CBD on a major parkway from the west. In turn, a signal system frequency generator determined the cycle length from the traffic counts. This signal system operated this way up until the early 80's when it was basically utilized as fixed time system operated by time clocks for peak and off-peak operation with 80 second cycles.

One problem that existed in the afternoon peak was the problem of parking garages and lots emptying into the streets and causing a queue of stopped vehicles in all lanes before the next signal turned green, thereby causing the progressive speeds to breakdown. As a result, the signal operation was scheduled for simultaneous operation during the peak hour

We also had a freeway feeder street system of 4 streets by18 blocks (330' c.-c.) long that operated on fixed time of 40, 60 and 80 second cycles with the same 1/4 cycle offset and same speeds as in the CBD. The only problem that existed was the 2-way Main St. that caused all traffic on the 4 streets to stop. The traffic on streets both east/west and north/south traveled at these speeds. This system continues to operate today. Peak hour operation was simultaneous.

Monday, July 1, 2013

Bicycle Turn Lane at Brookline & Beacon in Boston

I biked through several circles that are historic in Boston. There were challenges at many of these intersections because of the width of the intersections and the angles that folks were turning. This particular circle at Brookline and Beacon is a great example of a circle that has been recently reconfigured. Not designed for the 8 to 80 set , it does feature a bicycle turn lane that is badly faded from vehicles tracking along the dashed bike lane on either side. It was a busy intersection so there was no way to measure the width, but in riding this sort of configuration, it did provide an opportunity to take some space in order to make the crossing movement. It wasn't comfortable and I wouldn't take my 7-year old, let alone my 10-year on this sort of configuration (okay, maybe the 10-year old since she has done 2 years of Community Cycling Center Bike Camps)
The other option would have been to continue through the intersection and then cross at the signal similar to a Copenhagen left. The last one of these installed in Portland at SE Water & SE Clay associated with the Portland to Milwaukie Light Rail project has not been well used, so in this instance, it is unclear whether that's a great concept for this particular situation. It's also clear that it is difficult to communicate to cyclists what we'd like for them to do at an intersection, obviously, signage is something that can be helpful when you're in a busy intersection that you are unfamiliar with.  
Posted by Picasa