| The base for the tracks was very minimal, similar to Portland streetcar construction. |
| The concrete blocks under the rails is supported with sand, hard to tell how deep here. |
| Depth of construction was likely limited because of the lack of heavy truck traffic. |
| One more photo. During the two weeks I was there the slab was poured around the rails. |

No comments:
Post a Comment